![architectural drawing of the completed utility corridor and roadway at umass boston](/sites/umassba.net/files/styles/smallish_16_9/public/image/projects/boston-utility-corridor.jpg?itok=oSlIn6J6)
UMass Boston
Campus-wide utility distribution and roadway infrastructure to support build-out of the campus master plan.
OPM: Joslin, Lesser + Associates, Inc.
Designer: BVH Integrated Services, Inc.
CM: Bond Brothers
Project Completion Date: May 31, 2020